Dieldrin Testing Data - March 10, 2026
- nrlee52
- 4 days ago
- 1 min read
On February 25, 2026 GWA had previously reported the status of entry points that tested higher than, or equal to 50% of the IAL for dieldrin. The table below provides a status update to the February 25 reporting with analytical data from samples collected on March 10, 2026:
Dieldrin Sampling Results - Running Annual Average (RAA) – 124 SAMPLE LOCATIONS | ||
Wells | RAA | Remarks |
30 | Non-Detect (ND) | • No detections for dieldrin |
86 | 0.01 ppb to 0.09 ppb | • 86 locations are less than 0.1 ppb or 50% of the IAL |
4 | 0.10 ppb to 0.14 ppb | • A-23 & A-25 offline for PFAS since 2016; treatment under construction • M-2 & D-18 remain online; RAAs for both are 0.014 and neither has had RAA over the IAL. |
4 |
0.15 ppb to 0.19 ppb | • M-4 offline since 10/3/25; RAA is 0.16 ppb; treatment under construction • M-3 is was placed on standby on 10/19/25; placed online intermittently only if needed operationally to meet customer demand; Result for samples taken on 3/10/26 is 0.15 ppb; RAA is 0.16 ppb; M-3 was placed offline on 01/26/26. • EX-11 remains online and has not had a RAA over the IAL; Result for samples taken on 3/10/26 is 0.15 ppb; RAA is 0.15 ppb. • D-17 offline since 7/31/25; treatment under construction. Result for samples taken on 3/10/26 is 0.1 ppb. RAA remains at 0.09 ppb. |